Veteran-owned · Independent insurance brokerageCommercial & industrial risk insurance
Montridge Insurance ServicesMarine contractors
Insurance & risk resources
Montridge / operations

Dry-Dock & Vessel Haul-Out Insurance

Moving a vessel out of the water concentrates responsibility at the points of lifting, support, positioning and return to service.

Shipyard worker in protective clothing grinding steel, with sparks visible.
Shipyard worker in protective clothing grinding steel, with sparks visible. Photo: Eugene Oliver / U.S. Department of Defense. Illustrative imagery.

Identify the docking system and operating role

Describe floating docks, graving docks, marine railways, travel lifts or other haul-out arrangements separately. Include capacities, vessel types, maximum customer vessel values and any movement performed by subcontractors. Explain who prepares the docking plan, supplies vessel information and approves positioning or blocking. Ownership of the dock or lift does not by itself determine who has accepted responsibility for the vessel during the operation.

Review property damage and custody exposures

The customer's vessel, the docking facility and the contractor's equipment represent different property interests. Examine how the insurance program addresses damage during lifting, support, shifting, flooding or relaunching. Consider repair operations that take place while the vessel is docked, including hot work and work performed by outside contractors. Discuss business interruption implications if the docking system is damaged. Insurance for the dock's physical value should not be mistaken for liability protection for every vessel it handles.

Provide the operational evidence

Useful records include equipment particulars, inspection and maintenance information, capacity controls, operating procedures and customer agreements. Describe maximum concurrent vessel accumulations and responsibility for work by third-party repairers. Identify emergency arrangements for loss of power, water ingress or severe weather as relevant to the facility. If the yard changes the sizes or types of vessels it accepts, update the insurance review. A different hull configuration or docking method may create questions not reflected in the original submission.

Questions worth asking

Does the vessel owner's insurance remove the yard's exposure?

Not necessarily. The owner or its insurer may pursue the yard depending on the facts, contract and applicable law. Review both contractual allocation and the yard's own coverage.

Why disclose subcontracted haul-out services?

The yard may retain contractual responsibilities even when another company performs the movement. The subcontract and insurance arrangements need to be considered together.

Your operation. Your contracts. Your next project.

Put your marine insurance
in the context of your work.

Start with a focused conversation about your operation.